Project Portfolio |  GM Volt Battery Assembly Plant

Aug
5
2014
GM Volt.JPG

Project: GM Volt Battery Assembly Plant
Location: Brownstown Twp., Michigan
Square Footage: 400,000 Sq. Ft.

Project Highlights:

  • Completion of the interior infrastructure of the three-phase 400,000 square foot General Motors Volt Battery Assembly facility in Brownstown Township, Michigan.
  • Installation of the 1,600 amp overhead buss duct for the production lines.
  • New 3,000 amp electrical service to the building for a more reliable energy source including     transformer, primary lineup and switch.
  • Compressed air distribution including a new 400 CFM compressor.
  • New mechanical rooftop systems for heating and cooling of the entire facility.  The new system included ten (10) 10-ton rooftop units, one (1) Cambridge unit, and DDC controls.
  • Renovation and expansion of existing offices.
  • Loading dock renovations to meet General Motors’ requirements for dock levelers and a dust free interior.  Dock work included dock levelers, dock shelters, and overhead door seals.